国产成人综合久久精品红-国产成人综合久久精品亚洲-国产成人综合久久精品尤物-国产成人综合久久亚洲精品-久久99国产精品久久99无号码-久久99国产精品久久99小说

濟南蓬發建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關信息發布和相關資訊,敬請關注!
新聞
聯系我們
咨詢電話
15866735826

聯系:張經理

手機: 15866735826

郵箱: 394441862@qq.com

網址:http://www.hc188.cn/

地址:山東省濟南市章丘圣井工業園

當前位置: 首頁 > 新聞中心 > 行業動態

臨邊護欄防護作業操作的事項介紹

來源:http://www.hc188.cn/   發布時間:2024-03-13

在臨邊護欄作業施工時重要的是,大于一切,但盡管三令五申強調作業,但還是有很多企業違反規定沒有按照政策去施工,導致了生產問題時有發生,給和社會造成很大損失。因此頒布臨邊洞口作業施工標準規范工地操作施工,這是繼91年標準后2016年新的基本規定。

When working on edge guardrails, it is important to prioritize safety. Safety is paramount. Despite the country's repeated emphasis on safe operations, many enterprises still violate regulations and fail to follow national policies, resulting in frequent safety production issues and causing significant losses to the country and society. Therefore, the country has issued construction standards for edge opening operations to regulate the safe operation and construction of construction sites, which is a new basic regulation in 2016 following the 91 year standard.

1 建筑施工中凡涉及臨邊與洞口作業、攀登與懸空作業、操作平臺、交叉作業及網搭設的,應在施工組織設計或施工方案中制定高處作業技術措施。

For construction involving edge and hole operations, climbing and suspended operations, operating platforms, cross operations, and safety net installation, safety technical measures for high-altitude operations should be formulated in the construction organization design or construction plan.

2 高處作業施工前,應按類別對防護設施進行檢查、驗收,驗收合格后方可進行作業,并應做驗收記錄。驗收可分層或分階段進行。

20230315030529840.jpg

Before carrying out high-altitude operations, safety protection facilities should be inspected and accepted according to their categories. Only after passing the acceptance can operations be carried out, and acceptance records should be kept. Acceptance can be carried out in layers or stages.

3 高處作業施工前,應對作業人員進行技術交底,并應記錄。應對初次作業人員進行培訓。

Before carrying out high-altitude operations, safety technical briefing should be conducted to the workers and recorded. Training should be provided to first-time workers.

4 應根據要求將各類警示標志懸掛于施工現場各相應部位,夜間應設紅燈警示。高處作業施工前,應檢查高處作業的標志、工具、儀表、電氣設施和設備,確認其完好后,方可進行施工。

4. Various safety warning signs should be hung at the corresponding parts of the construction site according to requirements, and red lights should be set up for warning at night. Before carrying out high-altitude operations, safety signs, tools, instruments, electrical facilities, and equipment for high-altitude operations should be checked and confirmed to be in good condition before construction can proceed.

5 高處作業人員應根據作業的實際情況配備相應的高處作業防護用品,并應按規定正確佩戴和使用相應的防護用品、用具。

5. High altitude workers should be equipped with corresponding safety protection equipment according to the actual situation of the work, and should correctly wear and use the corresponding safety protection equipment and tools according to regulations.

6 對施工作業現場可能墜落的物料,應及時拆除或采取固定措施。高處作業所用的物料應堆放平穩,不得妨礙通行和裝卸。工具應隨手放入工具袋;作業中的走道、通道板和登高用具,應隨時清理干凈;拆卸下的物料及余料和廢料應及時清理運走,不得隨意放置或向下丟棄。傳遞物料時不得拋擲。

6 pairs of materials that may fall on the construction site should be promptly removed or fixed measures taken. The materials used for high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading. Tools should be easily placed in a tool bag; The walkways, walkways, and high-altitude equipment used in homework should be cleaned at all times; The dismantled materials, surplus materials, and waste materials should be cleaned and transported away in a timely manner, and should not be arbitrarily placed or discarded downwards. Do not throw materials during transfer.

7 高處作業應按現行標準《建設工程施工現場消防技術規范》GB 50720的規定,采取防火措施。

7. Fire prevention measures should be taken for high-altitude operations in accordance with the current national standard GB 50720 Technical Code for Fire Safety at Construction Sites.

8 在雨、霜、霧、雪等天氣進行高處作業時,應采取防滑、防凍和防雷措施,并應及時作業面上的水、冰、雪、霜。當遇有6級及以上強風、濃霧、沙塵暴等惡劣氣候,不得進行露天攀登與懸空高處作業。雨雪天氣后,應對高處作業設施進行檢查,當發現有松動、變形、損壞或脫落等現象時,應立即修理完善,維修合格后方可使用。

When working at heights in rainy, frosty, foggy, snowy or other weather conditions, anti slip, anti freezing, and lightning protection measures should be taken, and water, ice, snow, and frost should be promptly removed from the work surface. When encountering severe weather conditions such as strong winds of level 6 or above, dense fog, and sandstorms, outdoor climbing and suspended high-altitude operations are not allowed. After rainy and snowy weather, safety facilities for high-altitude operations should be inspected. If any looseness, deformation, damage or detachment are found, they should be repaired and improved immediately. Only after passing the repair can they be used.

9 對需臨時拆除或變動的防護設施,應采取可靠措施,作業后應立即恢復。

Reliable measures should be taken for safety protection facilities that need to be temporarily dismantled or changed, and they should be restored immediately after operation.

本文由工地圍擋提供幫助,更多的相關內容請點擊http://www.hc188.cn希望本文能夠為您帶來幫助,感謝您的閱讀!

This article is provided by the construction site fence for assistance. For more related content, please click on http://www.hc188.cn I hope this article can be helpful to you. Thank you for reading!

主站蜘蛛池模板: 天天干天天操天天透| 欧美一卡二卡3卡4卡无卡免费 | 久久a 热6| 天堂网2021天堂手机版丶| 99久久免费精品| 欧美午夜视频| www.四虎.com| 日本久久精品| 国产2区| 色婷婷小说网| 国产一级网站| 亚洲欧美日韩精品永久在线| 好男人www在线社区影院| 天天做夜夜做久久做狠狠| 国产手机在线播放| 亚洲国产美女| 久久综合久久久| 91啦国产| 日产精品乱码卡一卡2卡三| 国产成人精品大片免费下载| 色偷偷网| 精品3d动漫视频一区在线观看| 亚洲日本中文| 欧美精品v欧洲精品| www伊人网| 深爱激情婷婷| 久久99久久99精品| 88av免费观看入口在线| 欧美极品在线播放| 国产成人在线观看免费网站| 天天干夜夜操美女| 久久国产精品久久| 99精品wwxx在线观看| 色开心婷婷| 久久久国产高清| www日本xxxx| 婷婷网五月天天综合天天爱| 久久99精品久久久久久噜噜噜 | 久草视频在线资源| 99 久久99久久精品免观看| 日韩爽爽爽视频免费播放|