鋼筋加工棚的8點安裝事項

來源:http://www.hc188.cn/   發布時間:2023-02-17

鋼筋加工棚是施工現場鋼筋調直、彎曲和焊接的場所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設預埋件(預埋件包含在單柱鋼棚內,雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對接,(不要擰14個螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個螺絲)。否則,支架的孔沒有對齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時,確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個2.99米鉆尾,鋼筋加工棚4個2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規范是日常建筑施工中必不可少的。這種規范可以給我們帶來放心,保證建筑的牢固性。更多相關內容就來我們網站http://www.hc188.cn咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://www.hc188.cn consulting service

主站蜘蛛池模板: 张柏芝2008久久久久国产| 一区二区三区在线| 免费a网址| 国产福利在线网址成人| 一级二级毛片| 日本视频播放免费线上观看| 激情欧美乱妇| www.四色| 亚洲午夜高清| 日韩精品视频在线观看免费| 九九在线观看精品视频6| www午夜视频| 亚洲香蕉影院| 日韩精品视频网| 噜噜噜噜私人影院av线观看| 国产黄色在线视频| 91.久久| 天天操夜夜拍| 欧美日韩国产一区二区三区| 美国一级毛片视频| 国产日韩欧美一区二区三区在线| 8x网站免费入口在线观看| 乌龙院在线观看免费观看完整版| 欧美视频在线观看| 久草热在线观看| 成人综合色站| 2022国产精品手机在线观看| 网红思瑞一区二区三区| 欧洲黄色片| 久久久久一| 国产色婷婷精品综合在线观看| 99久久精品视香蕉蕉er热资源| 亚洲天堂黄| 手机上免费看twitch的加速器 | 中文精品99久久国产| 神秘感染1在线观看高清完整免费观看| 免费观看亚洲视频| 黄页网站视频在线观看| 国产国产成人精品久久| 99国内精品久久久久久久| 亚洲欧美中文日韩在线v日本 |